Mon, Nov 19
Welcome
Scolese
0:05
9:00 AM
Organization and Introductions
Spergel/Gehrels
0:15
9:05 AM
Introduction to Project Team
Grady
0:10
9:20 AM
Charge from NASA HQ
Hertz/Grunsfeld
0:45
9:30 AM
Science Technique Presentations
Overview of technique
Observing requirements (include impacts of image quality, wavelength cutoff, plate scale, and survey depth)
Break
0:15
10:45 AM
Lunch
0:30
12:15 PM
Use As Is definition
Requirements from past DRMs
Payload optical layout
Payload packaging
SDT Discussion of Current Concept
All
0:45
1:30 PM
Science Technique Presentations continued
Break
0:15
3:45 PM
Tue, Nov 20
Serviceability of observatory
Fault tolerance (recommendations from DRM2)
Orbit trade (includes LV, thermal, and radiation)
Integration times vs. temperature
Slew-settle analysis
IDRM temperature & wavefront stability
SDT Discussion on Systems Considerations
All
0:30
9:00 AM
Telescope
Abplanalp/Goullioud
0:45
9:30 AM
Telescope intro
Stray light analysis (ITAR restricted)
Initial thermal results (ITAR restricted)
Break
0:15
10:15 AM
Plans/configuration trades/concept
Possibilities for supernova science
Lunch
1:00
11:30 AM
RESTORE Servicing
Keer
0:30
1:30 PM
Servicing Capabilities
Questions